| 211 |
Remaining work of construction of Govt Shishu Hospital at Barishal. SH- (Supply and Installation of 1000KVA Sub-Station Equipment, Supply and Installation of 400 KVA Emergency Generator, Supply and Installation of 20 HP Submersible Pump Motor set, Supply and Installation of 10 HP Centrifugal Pump Motor set, Supply and Fixing of Fire Extinguisher, Supply and Installation of Air Conditioning System, Lighting Protection and Earthing System, LT Overhead Line, Compound and Garden Lighting, PABX Cum Intercom System, LT Feeder Cable, On Grid Solar System, Digital Sign Board, CC Camera System, Digital Conference System and PA/Sound System.
PWD/GoB/Shishu/Barishal/Goods/G-18/Ka/2025-26-Re-T
|
EE, PWD, BARISHAL |
|
25/05/2026
12:00 PM
|
Barishal |
| 212 |
Establishment of Cancer, Kidney & Heart Disease unit at 8(Eight) Divisional Medical College Hospital (1st Revised) One at Barishal Medical College Hospital. Sub-Head: Escalator 2 Pair.
PWD/Bari/Cancer/GD-04/2025-26
|
EE, PWD, BARISHAL |
|
25/05/2026
12:30 PM
|
Barishal |
| 213 |
Supply, Testing & Commissioning of Fully Digital 4D Color Doppler with Echo and Pediatric Probe &4D Color Doppler With Curvilinear and 4D TVS Probe.
39.01.0000.225.07.020.2022 (C)
|
Director, Bio-Science Division |
08/01/2026 |
18/06/2026
02:00 PM
|
Dhaka |
| 214 |
Procurement of Warehouse Racking System for Sub-store of Marine Engineering Department.
18.13.0000.810.07.005.25
|
Chairman, Chittagong Port Authority represented by Deputy Chief Engineer (Marine). |
12/04/2026 |
15/06/2026
11:00 AM
|
Chattogram |
| 215 |
Procurement of 2000 MT Cold rolled Steel sheets (CRSS)
ER/PUR/IT-04/2026
|
Materials |
12/05/2026 |
25/06/2026
04:00 PM
|
Chattogram |
| 216 |
Refined Palm Olein
26.05.0000.016.08.135.26.1791
|
Additional Director (Commercial), TCB, Dhaka. |
11/05/2026 |
03/06/2026
12:00 PM
|
Dhaka |
| 217 |
White Refined Sugar
26.05.0000.016.08.135.26.1792
|
Additional Director (Commercial), TCB, Dhaka. |
11/05/2026 |
03/06/2026
12:00 PM
|
Dhaka |
| 218 |
Whole Husked (Without Husk) Red Lentil
26.05.0000.016.08.135.26.1793
|
Additional Director (Commercial), TCB, Dhaka. |
11/05/2026 |
03/06/2026
12:00 PM
|
Dhaka |
| 219 |
Design, Supply, Installation, Testing & Commissioning of 132/33 KV AIS Substations at Dhupchanchia, Kumarkhali, Matlab North and Chatkhil including associated 132kV bay extension at Kachua Substation on turnkey basis (Package-4)
27.21.0000.101.07.434.26.2175, May 10, 2026
|
Project Director, PTSIREP |
10/05/2026 |
06/07/2026
11:00 AM
|
Dhaka |
| 220 |
28.27.0000.000.014.99.0001.25-286
|
LP Gas Limited (LPGL), A Subsidiary of Bangladesh Petroleum Corporation. |
30/04/2026 |
17/05/2026
02:30 PM
|
Chattogram |