| 1 |
18.16.0000.373.02.332.26-27/ COMC-01112026
|
Bangladesh Agriculture Development Corporation (BADC) |
02/11/2026 |
08/11/2026
12:15 PM
|
Dhaka |
| 2 |
Construction of Five Climate Resilient Bridges in Mymensingh Division, Bangladesh
35.01.0000.081.14.003/W1.26-65
|
Project Director (ACE, RHD) |
03/11/2026 |
08/12/2026
02:00 PM
|
Dhaka |
| 3 |
Different B & R Works of Bangladesh Army for the financial year 2026-2027 (As per Ser No. 15)
06 of 2026-2027/E-6
|
DW & CE (Army) Dhaka Cantt |
27/10/2026 |
26/11/2026
12:00 PM
|
Dhaka |
| 4 |
Supply and Installation of Medical Gas (Oxygen and Suction) Pipeline Systems
for the Dialysis Centre at Tangail Medical College Hospital under the Project
'Upgradation of Existing Kidney Dialysis Centers to 50 Beds in Medical College
Hospitals and Establishment of 10-Bed Kidney Dialysis Centers in District
Sadar Hospitals (2nd Revised)
PWD/GOB/Kidney/Tangl/W- 17
|
Executive Engineer, Tangail PWD Division, Tangail |
|
19/11/2026
02:30 PM
|
Tangail |
| 5 |
1. Improvement of Barikandi Launchghat Bazar- Sreeghar GC (south at, shyamgram road) via Barikandi Up road from Ch. 00 m-3115 m, Effective Length= 3.115 km, Road ID: 412853001, Under Upazila: Nabinagar District: Brahmanbaria.Salvage Cost: 15,12,506.00 2. Improvement of Shibpur Bazar R&H to Bitghar UP office road from Ch. 00 m- 4420 m, Effective Length= 4.42 km, Road ID: 412853008, Under Upazila: Nabinagar,'District: Brahmanbaria. Salvage Cost: 10,54,333.00 Total Cost of Salvage Materials: TK: 25,66,839.00
46.02.0000.931.16.732.26-1241 Date: 14-10-2026
|
The PE is Local Government Engineering Department, represented by: Executive Engineer, District: Brahmanbaria |
|
03/12/2026
01:00 PM
|
Brahmanbaria |
| 6 |
Rehabilitation of Bancharampur H/Q-Fardabad UP (R&H) road at Ch. 00 m-8000m, Effective Length= 8.00 km, Road ID: 412042005, Under Upazila: Bancharampur District: Brahmanbaria.Total Cost of Salvage Materials:TK: 23,01,479.00
46.02.0000.931.16.732.26-1246 Date: 14-10-2026
|
The PE is Local Government Engineering Department, represented by: Executive Engineer, District: Brahmanbaria |
14/10/2026 |
03/12/2026
01:00 PM
|
Brahmanbaria |
| 7 |
Construction of 8-Storied Training Center Cum Dormitory Building including 02 (Two) Basement at BIAM Foundation, Eskaton, Dhaka (Sub-Had Fire Detection & Detection & Protection System)
egp/Biam/SE/04/01/26
|
Executive Engineer, PWD E/M Division-5, Dhaka |
|
18/11/2026
03:00 PM
|
Dhaka |
| 8 |
Construction of 44.02m (1X42.68m) Long P.C Girder Bridge (Kagotia Bridge) at 6th km (Ch: 05 +256m) on Raozan - Noapara Zilla Road (Z-1629) under Chattogram Road Division during the year 2026-2027.
e-GP/PMP Bridge/03/EE/CRD/RHD/2026-2027 (ID-1364749)
|
Executive Engineer, RHD, Road Division, Chattogram |
04/11/2026 |
30/11/2026
12:00 PM
|
Chattogram |
| 9 |
Design and Construction of the Mahadev, Ganeshwari & Nitai Bridge, Package-W3.
35.01.0000.080.14.003/W3.26-62
|
Project Director (ACE, RHD) |
01/11/2026 |
02/12/2026
02:00 PM
|
Mymensingh |
| 10 |
18.16.0000.373.03.209.26-27/ COMC-006
|
Bangladesh Chemical Industries Corporation (BCIC) |
28/11/2026 |
08/11/2026
11:40 AM
|
Dhaka |