| 331 |
(1) Package No. MCEP/BREB/DMD-W-393:
Design, supply, installation, testing & commissioning etc all complete as required for installation of Fault Locator on overhead distribution network of 33 kV source Lines in 11 PBSs under “Modernization and Capacity Enhancement of BREB Network (Dhaka-Mymensingh Division) (1st Revised)” Project, BREB on Turn-key Basis.
(2) Package No. MCEP/BREB/DMD-W-394:
Design, supply, installation, testing & commissioning etc all complete as required for installation of Fault Locator on overhead distribution network of 33 kV source Lines and pilot basis on 11 kV backbone line in 7 PBSs under “Modernization and Capacity Enhancement of BREB Network (Dhaka-Mymensingh Division) (1st Revised)” Project, BREB on Turn-key Basis.
(3) Package No. MCEP/BREB/DMD-W-395:
Design, supply, installation, testing & commissioning etc all complete as required for installation of Fault Locator on overhead distribution network of 33 kV source Lines and pilot basis on 11 kV backbone line in 7 PBSs under “Modernization and Capacity Enhancement of BREB Network (Dhaka-Mymensingh Division) (1st Revised)” Project, BREB on Turn-key Basis.
27.12.0000.224.07.038.24.574; Date: 19-04-2026
|
“Modernization and Capacity Enhancement of BREB Network (Dhaka - Mymensingh Division) (1st revised) Project.” |
19/04/2026 |
19/05/2026
12:00 PM
|
Dhaka |
| 332 |
TURNKEY CONTRACT FOR DESIGN, SUPPLY, RENOVATION, CONSTRUCTION, INSTALLATION, TESTING & COMMISSIONING OF 33/11kV, 2x10/14 MVA GANGADHARPATTY INDOOR SUB-STATION WORKS FOR MANIKGANJ PBS.
27.12.0000.173.18.018.26.499
|
Office of the Superintending Engineer (Grid & Substation), BREB, Dhaka |
16/04/2026 |
14/05/2026
12:00 PM
|
Dhaka |
| 333 |
TURNKEY CONTRACT FOR DESIGN, SUPPLY, CONSTRUCTION, INSTALLATION, TESTING & COMMISSIONING OF 33 KV AIS SWITCHING STATION AND RELATED WORKS AT BK BARI SUB-STATION FOR GAZIPUR PBS-2.
27.12.0000.173.18.018.26.499
|
Office of the Superintending Engineer (Grid & Substation), BREB, Dhaka |
16/04/2026 |
14/05/2026
12:00 PM
|
Dhaka |
| 334 |
Procurement of Pharmaceutical Raw Materials Desogestrel USP & Ethinyl Estradiol USP .
IMP/RM/SEM/89/2025-2026
|
Managing Director, Essential Drugs Company Ltd. |
12/04/2026 |
25/05/2026
03:00 PM
|
Dhaka |
| 335 |
Supply and Installation of Conferencing System with Audio Solutions and Indoor LED Video Wall with Video Tracking Solutions at Senate Building, Rajshahi University
Ru/Gob/038/Goods/2025-26
|
Md Abul Kalam Azad, Chief Engineer |
19/04/2026 |
04/05/2026
02:00 PM
|
Rajshahi |
| 336 |
Procurement of Update and Annual Maintenance Contract of Telecom Data Information System (DIS).
14.32.0000.000.400.07.0018.25.570
|
Director, Administration Division, BTRC |
13/04/2026 |
30/04/2026
02:00 PM
|
Dhaka |
| 337 |
Establishment of complete cancer, kidney and heart treatment center in 8 (Eight) divisional cities one at Khulna Medical Collage
Hospital, Khulna (1st Revised) [Sub Head: Escalator 2 pair]
emkhul/cancer/escalator/GD-4
|
Khulna PWD EM Division, Khulna |
09/04/2026 |
12/05/2026
04:00 PM
|
Khulna |
| 338 |
1. Silicon Electrical steel sheet (Angular Cut Core) 2. Paper Insulated Copper Strip (Size: 2.3 × 7.4 mm)
36.93.1565.680.52.001/003.26.1280/1281
|
General Electric Manufacturing Co. Ltd.(GEMCO) |
09/04/2026 |
11/05/2026
11:30 AM
|
Chattogram |
| 339 |
Supply, Installation, Testing and Commissioning of 500 KVA Diesel Generator at Bangladesh Bank Barishal office, Barishal.
CSD-2(MES): 14/1(generator)/2026-264
|
Bangladesh Bank |
09/04/2026 |
23/04/2026
03:00 PM
|
Dhaka |
| 340 |
1. GD-3 GD-04, GD-05, GD-06 & GD-07 Furniture for 19 centers (Lot: 1, 2, 3, 4, & 6)
2.GD-11, Furniture for 19 centers (Lot: 5)
3.GD-20,21,22, Bedding for 19 centers (Lot: 1, 2, 3 & 4)
4. GD-10, Bedding for 19 centers (Lot: 1, 2, 3 & 4)
5. GD-23 Consumables for 19 centers
41.01.0000.111.14.124.26-730
|
Project Director, |
07/04/2026 |
07/05/2026
12:00 PM
|
Dhaka |