| 111 |
Improvement/ Construction/ Rehabilitation of 12181 m Roads b y Uni-Block & DBC i n 9 locations, including 357 m Protection Works, Construction of 07 Nos Cross drain & installation of 411 Nos. Street Lights with 200 nos. Tree plantation at Ramgati Pourashava, District: Laxmipur.
IUGIP/RAMG/UT/03/2023
|
PIU Office of the Ramgati Pourashava |
|
23/07/2026
02:00 PM
|
Lakshmipur |
| 112 |
Improvement / Rehabilitation/ Construction of Roads 5118.00 m in 11 locations, 156.00m of Slope Protection Work, Installation of 182 nos. street light. Including EMP cost at Ramgati Pourashava, Laxmipur.
IUGIP/RAMG/UT/04/2023
|
PIU Office of the Ramgati Pourashava |
|
16/07/2026
12:30 PM
|
Lakshmipur |
| 113 |
Construction of RCC Jetty with allied works at Subrang, Teknaf, Coxs Bazar under the project of "Establishment of Jetties and Infrastructure at Mirsarai & Sandwip in Chittagong, Subrang-Jaliar Dwip at Teknaf and Sonadia Dwip at Coxs Bazar". (e-GP Tender ID: 1293481)
18.11.15.41.273.14.178(49).24/506
|
Office of the Project Director establishment of jetties and infrastructure at Chittagong, and Coxs Bazar |
18/06/2026 |
21/07/2026
12:00 PM
|
Dhaka |
| 114 |
Copper Wire Size: 8.0 mm
36.03.1565.006.606.57.0141.26
|
Managing Director |
08/06/2026 |
20/07/2026
11:30 AM
|
Dhaka |
| 115 |
Supply and Implementation of Commercial power connection system at different BTS sites.
Tender/Proposal ID : 1255874 (Invitation Reference No. : 14.35.0000.460.07.025.22/435)
|
Project Director, “Expansion of Teletalk’s Network up to Rural Areas and Network Readiness for 5G Services” -Project, Teletalk Bangladesh Limited |
23/06/2026 |
16/07/2026
02:00 PM
|
Dhaka |
| 116 |
Establishment of University Innovation Hub in Daffodil International University, Ashulia
56.02.0000.028.07.211.26-879
|
Digital Entrepreneurship and Innovation Eco-System Development Project |
22/06/2026 |
13/07/2026
03:00 PM
|
Dhaka |
| 117 |
City/R-2/Fund/LATC/Lift Core/2025-26
|
Exective Engineer, City PWD Division, Dhaka |
|
28/06/2026
04:00 PM
|
Dhaka |
| 118 |
Remaining construction work of 02-storied barrack with 12-storied foundation at Barishal District Police Lines.
Bari/PWD/Rem. Barrack/Police Lines/Rev/2025-2026
|
EE,PWD,BARISHAL |
|
13/07/2026
12:30 PM
|
Barishal |
| 119 |
Construction of 4-Storied Academic cum Administrative Building with 4-Storied foundation including Civil, Internal & External Sanitary, Internal & External Electrification, Site Development, RCC Compound Road, Compound Drain & Apron, Boundary Wall, Deep Tube well with Distribution pipe, Sub-station Building, Shahid Minar, Cycle Shed etc. under the project Establishment of Muladi Textile Vocational Institute at Muladi, Barishal.
PWD/Bari/Muladi Textile/W-1/2025-26
|
EE,PWD,BARISHAL |
|
13/07/2026
12:30 PM
|
Barishal |
| 120 |
Construction of 5-Storied Office Building with 7-Storied Foundation with Men's and Women Barrack including Internal Sanitary and Internal Electrification Works, Internal Decoration works, Land Development, External Water Supply and Sanitary Works, PABX-Intercom System, CCTV, Networking System, PA & Digital Conference System, Lightening Protection System, Compound & Security Light, Solar System and Sign Board, Fire Extinguisher and Pump Motor Set and Ancillary Works (Pump House & Substation Room, Guard Room, Saluting Dias, Internal RCC Road, Sepoy Shed, Main Gate, Master Drain, Boundary Wall, Birbed Wire Fencing) at Barishal under the Project of Construction of Narcotics Control Department District Office (1st Phase)
Bari/PWD/Narcotics/Purto-13/2025-2026
|
EE, PWD, BARISHAL |
|
13/07/2026
12:30 PM
|
Barishal |