| 1481 |
46.19.0000.018.14.020.24.289
|
Superintending Engineer |
13/04/2025 |
14/05/2025
02:00 PM
|
Gazipur |
| 1482 |
(1) Upgrading of RCC Road at Islambagh road start from tin sarak to madina nagor road. (ch.0+00-0+352 & ch.0+00-0+155) (Ward no-26). (2) Construction of RCC Drain at Islambagh road start from Tin sarak to Madina nagor road. (ch.0+00-0+352 & ch.0+00-0+155) (Ward no-26). (3) Upgrading of RCC Road from neyamot sarak to Didar pagla mazar road via h/o Akka & Insan at Hazi para. (ch.0+00-0+570) ) (Ward no-26). (4) Construction of RCC Drain start from Hazi para Mosque neyamot sarak to didar pagla mazar road via h/o Akka & Insan at Hazi para. (ch.0+00-0+460) ) (Ward no-26). (5) Upgrading of RCC road from BIDC road to Bankers road via Ataullah Mandol house via Popular Hospital.(ch.0+00-0+150) (ward no-26). (6) Construction of RCC Drain from bidc road to bankers road via Ataullah mandol house via popular hospital. (ch.0+00-0+150) (Ward no-26).
46.19.0000.018.14.020.24.289
|
Superintending Engineer |
13/04/2025 |
14/05/2025
02:00 PM
|
Gazipur |
| 1483 |
(1) Construction of RCC Drain start from Cha bagan road to east direction koler bazar Road upto bright star kinder garden.( ch.0+00-0+550 , link ch.0+00-0+85 ) (ward no-29) (2) Upgrading of Road by RCC start from Cha bagan road to east direction koler bazar Road upto bright star kinder garden. .( ch.0+00-0+550 , link ch.0+00-0+85 ) (ward no-29) (3) Upgrading of RCC Road start from BIDC road to east direction via Baitul Mamud jame mosque to uttar Bilashpur chapra mosque.( ch.0+00-0+365) (ward no-26). (4) Construction of RCC Drain start from BIDC road to east direction via Baitul Mamud jame mosque to uttar Bilashpur chapra mosque. ( ch.0+00-0+365) (ward no-26).
46.19.0000.018.14.020.24.289
|
Superintending Engineer |
13/04/2025 |
14/05/2025
02:00 PM
|
Gazipur |
| 1484 |
(1) Upgrading of RCC Road start from Shasan mour to west direction new mosque via h/o Momtaj & h/o Noyon . (ch.0+00-0+210) (Ward no-28). (2) Construction of RCC Drain start from start from Shasan mour to West direction new mosque via h/o Momtaj & h/o Noyon . (ch.0+00-0+175) (Ward no-28). (3) Construction of RCC Drain start from Markaj road to Baytul Falah Jame Mosque via h/o banker Forid Ahmed Sarkar at east direction.( ch.0+00-0+265) (ward no-25). (4) Upgrading of RCC Road start from Markaj road to Baytul Falah Jame Mosque via h/o banker Forid Ahmed Sarkar at east direction.( ch.0+00-0+265) (ward no-25).
46.19.0000.018.14.020.24.289
|
Superintending Engineer |
13/04/2025 |
14/05/2025
02:00 PM
|
Gazipur |
| 1485 |
(1) Upgrading of Road by RCC start from west side of Zajhor Deger chala road to Hazir pukur road via H/O Israfil & Sultan.(2) Construction of RCC Drain start from west side of Zajhor Deger chala road to Hazir pukur road via H/O Israfil & Sultan.(ch.00-170, Link ch.00-107) (ward no-32).
46.19.0000.018.14.020.24.289
|
Superintending Engineer |
13/04/2025 |
14/05/2025
02:00 PM
|
Gazipur |
| 1486 |
18.16.0000.373.02.248.25/ COMC-04042025
|
Bangladesh Agriculture Development Corporation (BADC) |
27/04/2025 |
04/05/2025
12:00 PM
|
Dhaka |
| 1487 |
18.16.0000.373.03.163.24-25 COMC-004
|
Bangladesh Chemical Industries Corporation (BCIC) |
27/04/2025 |
08/05/2025
12:00 PM
|
Dhaka |
| 1488 |
Construction of Production Tube Wells including Pump motors, VFD, Pump House and Electrical work including 2(Two) years operation & Maintenance.
46.07.0000.001.33.001.25-6947
|
Managing Director, Khulna WASA. |
27/04/2025 |
12/06/2025
03:00 PM
|
Khulna |
| 1489 |
Construction of Clear Water Transmission Main including Mayur river and Canal crossings including 2 years of operation and maintenance.
46.07.0000.001.33.001.25-6948
|
Managing Director, Khulna WASA. |
27/04/2025 |
16/06/2025
03:00 PM
|
Khulna |
| 1490 |
Design, Supply, Installation, Testing and Commissioning of Baghabari 5 MWp Grid Tied Solar Power Plant at Baghabari, Sirajganj, Rajshahi, Bangladesh on Turn Key Basis.
27.11.0000.304.25.439.25
|
Director, Directorate of Purchase, BPDB, Dhaka. |
23/04/2025 |
18/06/2025
11:00 AM
|
Dhaka |