| 161 |
Construction of 1.5 Ckt. Km Underground Cable Laying through HDD Boring/Opencut including supply, installation of HDPE Pipe at Dhaka-Asulia Elevated Exprees Way Area under Dhaka PBS-1 (Pillar No-538-548, west).
27.12.2672.184.02.015.552
|
SE, DHAKA NORTH ZONE |
12/11/2025 |
08/12/2025
12:30 PM
|
Dhaka |
| 162 |
Construction of 2.82 Ckt. Km Underground Cable Laying through HDD Boring/Opencut including supply, installation of HDPE Pipe at Dhaka-Asulia Elevated Exprees Way Area under Dhaka PBS-1 (Pillar No-558-580, west).
27.12.2672.184.02.015.553
|
SE, DHAKA NORTH ZONE |
12/11/2025 |
08/12/2025
02:00 PM
|
Dhaka |
| 163 |
Construction of 2.16 Ckt. Km Underground Cable Laying through HDD Boring/Opencut including supply, installation of HDPE Pipe at Dhaka-Asulia Elevated Exprees Way Area under Dhaka PBS-1 (Pillar No-580-616, west).
27.12.2672.184.02.015.554
|
SE, DHAKA NORTH ZONE |
12/11/2025 |
08/12/2025
03:00 PM
|
Dhaka |
| 164 |
Periodic Maintenance Work by Providing Aggregate Base Type-I, DBS Base Course, DBS Wearing Course, RCC Palasiding and Saucer Drain at Ch. 17+100 km (Umednagar) to Ch. 38+000 km(Timirpur) of Shaistaganj-Habiganj-Nabiganj-Sherpur(Auskandi)(R-240) Road under Road Division, Habiganj during the Year 2025-2026.
1176369, 01/PMP-Major Road/4111302/HRD-2025-26
|
Executive Engineer, RHD, Habiganj. |
13/11/2025 |
11/12/2025
01:00 PM
|
Habiganj |
| 165 |
Construction of RCC Drain at Solemanpur Karikar para h/o Engineer Abu Saleh Md. Hanif to River via Shake para, Dhopa para, Pal para. D1- Ch. 00m- 750m, 02- Ch. 00m- 100m, D3- Ch.00m- 120m. Total Ch. 970m at Ward No 04, 05 Under Kotchandpur Pourashava, District- Jhenaidah.
Memo no - Kot/poura/2025/642
|
Md. Masud Rana |
13/11/2025 |
02/12/2025
03:00 PM
|
Jhenaidah |
| 166 |
Repairing Damaged Pavement under Periodic Maintenance Programme (PMP) by Providing Aggregate Base Type-I, DBS Wearing Course, Construction of Rigid Pavement, R.C.C Toe Wall & Earth work at Ch. 26+700 to 33+100 km of Kaligonj (sherkul)-Naldangerhat-Surkutia Bazar (Z-5210) Road under Road Division Natore during the year 2025-26.
02/e-GP/PMP Road/OTM/NRD/2025-2026.
|
Executive Engineer, Natore Road Division, Natore. |
|
09/12/2025
07:00 PM
|
Natore |
| 167 |
Strengthening of Pavement Providing Base Type-I and DBS Wearing Coarse at Ch. 5th km(p) to 14th km(p) and Construction of Rigid Pavement at Ch. 9th km(p) & 12th km(p)of Walia - Dayarampur - Sonapur-Shonkerbagherhat-Natore Road (Z-6011) under Periodic Maintenance Program (PMP-Major Road) of Natore Road Division, during the year 2025-2026.
04/e-GP/PMP Road/OTM/NRD/2025-2026.
|
Executive Engineer, Natore Road Division, Natore. |
|
09/12/2025
04:00 PM
|
Natore |
| 168 |
Strengthening of Pavement Providing Base Type-I and DBS Wearing Coarse at Ch. 14th km(p) to 20th km(p) and Construction of Rigid Pavement at 14th km(p), 15th km(p), 20th km (p) & 21th km(p) of Walia - Dayarampur - Sonapur-Shonkerbagherhat-Natore Road (Z-6011) under Periodic Maintenance Program (PMP-Major Road) of Natore Road Division, during the year 2025-2026.
05/e-GP/PMP Road/OTM/NRD/2025-2026.
|
Executive Engineer, Natore Road Division, Natore. |
|
09/12/2025
07:45 PM
|
Natore |
| 169 |
Periodic Maintenance Programme (PMP) by Double Bituminous Surface Treatment (DBST) Work with necessary Repairing by DBS Base Course at Ch. 25+174 to 51+260 Km of Hatikamrul-Banpara (N-507) Road under Road Division, Natore during the year 2025-2026.
03/e-GP/PMP Road/OTM/NRD/2025-2026.
|
Executive Engineer, Natore Road Division, Natore. |
|
09/12/2025
12:10 PM
|
Natore |
| 170 |
Construction of 564.00 Meter Rigid Pavement at Horishpur Intersection (Ch. 0+400 Km) of Natore Old town Road (N-602) under Natore Road Division, during the year 2025-2026.
01/e-GP/PMP Road/OTM/NRD/2025-2026.
|
Executive Engineer, Natore Road Division, Natore. |
|
02/12/2025
12:35 PM
|
Natore |