| 2111 |
Construction of RCC Jetty with allied works at Mirsarai, Chattogram under the project of "Establishment of Jetties and Infrastructure at Mirsarai & Sandwip in Chittagong, Subrang-Jaliar Dwip at Teknaf and Sonadia Dwip at Coxs Bazar" (e-GP Tender ID: 1004922).
18.11.15.41.273.14.178.(22).23/201
|
A.S.M Ashrafuzzaman |
28/10/2024 |
28/11/2024
12:00 PM
|
Dhaka |
| 2112 |
18.16.0000.373.03.146.24-25, COMC-004
|
Bangladesh Chemical Industries Corporation (BCIC) |
29/10/2024 |
07/11/2024
12:00 PM
|
Dhaka |
| 2113 |
Widening of Road Embankment, Construction of New Pavement, Rigid Pavement, Canopy & Others works including Surfacing and Protective Works at ch. 2+151 to ch. 3+259 & ch. 5+704 to ch. 8+500 Km. of Keraniganj (Syedpur)- Hashara-Birtara-Shingpara-Kajalpur-Nagerhat Road (Z-8203) under Munshigonj Road Division during the year 2023-2024 [WP- 06]
TID No : 1029974
|
Executive Engineer, RHD, Road Division ,Munshiganj |
29/10/2024 |
20/11/2024
12:00 AM
|
Munshiganj |
| 2114 |
Procurement of Operation & Maintenance Expert Service for 12(Twelve) Months {4 (Four) Foreign Experts (i.e 48 Man Months)} for Bibiyana South 400 MW CCPP, BPDB, Hobigonj, Bangladesh.
27.11.0000.304.25.410.24
|
Director, Directorate of Purchase, BPDB, Dhaka. |
27/10/2024 |
11/12/2024
11:00 AM
|
Dhaka |
| 2115 |
Construction of R.C.C. Container Yard No-01 in the vacant land beside Truck Terminal adjacent to the Port Connecting Road.
18.13.0000.325.07.002.24
|
xen_building@cpa.gov.bd |
29/10/2024 |
27/11/2024
03:00 PM
|
Chattogram |
| 2116 |
Construction of R.C.C. Container Yard No-02 in the vacant land beside Mohesh khal at East R/A.
18.13.0000.325.07.003.24
|
xen_building@cpa.gov.bd |
29/10/2024 |
27/11/2024
03:00 PM
|
Chattogram |
| 2117 |
Operation & maintenance of surface water treatment plant including intake station at pasur river inside BNS mongla, tube well at foyla with all required spare parts.
18.14.0158.424.007.2398.2024/1
|
Chairman mongla port authority |
|
20/11/2024
02:30 PM
|
Bagerhat |
| 2118 |
Biodiversity Conservation and Implementation Along the IWT Corridor
18.11.0000.181.14.422.24.321
|
Project Director, BRWTP-1 |
27/10/2024 |
19/11/2024
02:00 PM
|
Dhaka |
| 2119 |
Supply and Installation of Pump Motor, Lake Water Management System, Special Security/Compound Lightning System, CCTV System, Metal Detector, Archway, Neon Sign, PABX/Intercom System, PA System & Fire Extinguisher, Surge Protection Devices (SPD) under the project of Extension of Museum Building and Construction of Others Physical Infrastructure of the Bangladesh Folk Art & Crafts Foundation at Sonargaon, Narayanganj
emdk9/2024-25/SonargaonMuseum/WD/EM-02
|
Executive Engineer (E/M), PWD E/M Division-9, Dhaka. |
27/10/2024 |
18/11/2024
10:10 AM
|
Dhaka |
| 2120 |
Refurbishment/Repair Works of Frame 9E Gas Turbine Capital Spares (Fuel Nozzle, Combustion Liner, Transition Piece, Stage-1, 2 & 3 Nozzle, Shroud, Bearings) of Chandpur 150 MW Combined Cycle Power Plant, BPDB, Chandpur, Bangladesh.
27.11.0000.304.25.306.24
|
Director, Directorate of Purchase, BPDB, Dhaka, Bangladesh |
24/10/2024 |
11/12/2024
11:00 AM
|
Dhaka |