| 271 |
As per SL No. 25
15 of 2025-2026/E-6
|
DW & CE (Air), Dhaka Cantt. |
20/04/2026 |
21/05/2026
12:00 PM
|
Dhaka |
| 272 |
Construction of 20 storied Tax Building ( 3 Basement +20 Storey )(Foundation, Basement, Super structure, Internal Water Supply and internal Sewerage, internal Electrification) under the project " Construction of Tax Building, Chattogram" at Agrabad, Chattogram.(Package W-1)
e-GP/CTG Div-4/2025-2026/Ctg/Tax/Building/W-1
|
Executive Engineer, Chattogram PWD Division-4, Agrabad, Chattogram |
03/05/2026 |
04/06/2026
02:00 PM
|
Chattogram |
| 273 |
eGP/jhal/model mosqe/zila remaining/2025-2026
|
Executive Engineer, Jhalokathi PWD Division |
30/04/2026 |
14/05/2026
03:30 PM
|
Jhalokati |
| 274 |
Construction of 2 Nos Pre-fabricated steel foot over Bridge of 34.00 meter length at ch 18+950 (BRRI) and 32.00 meter length at Ch. 19+950 (Shib Bari mor) including 4 nos Ramp (Ramp length = 4 X 85.20 meter) on BRT coridor of Joydebpur-Gazipur- Azmatpur-Itakhola (R-310) under Gazipur Road Division during the year 2024-2025.
e-GP-37/PMP Major/Foot Over Bridge/GRD/2024-2025
|
Executive Engineer,RHD,Road Division,Gazipur |
01/05/2026 |
20/05/2026
12:10 PM
|
Gazipur |
| 275 |
Construction of 2 Nos Pre-fabricated steel foot over Bridge of 28.00 meter length at ch 16+750 (East Chowrasta, Niljani) and 32.00 meter length at Ch. 18+650 (Teen Sorok) including 2 nos Ramp (Ramp length = 2 X 85.20 meter) on BRT coridor of Joydebpur-Gazipur- Azmatpur-Itakhola (R-310) under Gazipur Road Division during the year 2024-2025
e-GP-36/PMP Major/Foot Over Bridge/GRD/2024-2025
|
Executive Engineer,RHD,Road Division,Gazipur |
30/05/2026 |
20/05/2026
12:00 AM
|
Gazipur |
| 276 |
Construction of 4 Nos Pre-fabricated steel foot over Bridge of 35.00 meter length at ch 10+150 (Baro Bari), 34.00 meter length at Ch. 11+350 (Board Bazar), 34.00 meter length at Ch. 13+150 meter (Chaydana Meyor Bari) and 42.00 meter length at Ch. 14+100 (Colombia Garments) on BRT coridor of Dhaka (Banani) - Joydebpur- Mymensingh National Highway (N-3) under Gazipur Road Division during the year 2024-2025.
e-GP-35/PMP Major/Foot Over Bridge/GRD/2024-2025
|
Executive Engineer,RHD,Road Division,Gazipur |
30/04/2026 |
20/05/2026
12:00 PM
|
Gazipur |
| 277 |
Construction of 2 Nos Pre-fabricated steel foot over Bridge of 45.00 meter length at ch 7+100 (Tongi collage) & 37.00 meter length at Ch. 7+500 (tongi hossen Market) including 4 nos Ramp (Ramp length = 4 X 85.20 meter) on BRT coridor of Dhaka (Banani) - Joydebpur- Mymensingh National Highway (N-3) under Gazipur Road Division during the year 2024-2025.
e-GP-34/PMP Major/Foot Over Bridge/GRD/2024-2025
|
Executive Engineer,RHD,Road Division,Gazipur |
30/04/2026 |
20/05/2026
12:00 PM
|
Gazipur |
| 278 |
Construction of 3rd and 4th Floor (Vertical Extension) of NSI Building, Sylhet.
ACE/PWD/Syl/2025-2026/NSI/SD2/419
|
Executive Engineer Sylhet PWD Division, Sylhet |
|
18/05/2026
01:00 PM
|
Sylhet |
| 279 |
Construction of the July Uprising Commemoration Museum (Civil Part). Sub-head: Construction of Walk Way (Adjacent Lake Road & Udyan Part), Sprinkler System, Miscellaneous items (Glass Floor, Grill fencing, Barbed Wire etc) and Arboriculture works.
Dhaka PWD Metro Zone Memo-4172, Date-22/04/2026
|
Executive Engineer, Dhaka PWD Division-2, Dhaka |
22/04/2026 |
21/05/2026
02:00 PM
|
Dhaka |
| 280 |
Repair and Mending Works of Record Room Situated at Deputy Commissioner
Office, Jashore (Sub-Head: External Electrification).(Package No.-
WD36/Jashore)
SE Office Jashore, Memo No: 1653, Date: 07/04/2026
|
Jessore PWD Division, Jashore |
07/04/2026 |
14/05/2026
03:00 PM
|
Jashore |