| 3101 |
PMP (Major) work for Re-Construction with Base Type-I, DBS Base Course, DBS Wearing Course, Protective work, Road sign & Road marking of Ulania Bridge approach at 58km (Rongopaldi Bazar) (Ch.57+662 to 58+162) & 59km (Ulania Bazar) (Ch.58+342 to 58+692) of Lebukhali-Bauphal-Golachipa-Amragachia Road (Z-8806) under Patuakhali Road Division during the fiscal year 2023-2024.
01/e-GP/PMP-Roads/PRC/PATRD/2023-2024
|
Mohammed Masud Karim (Superintending Engineer) |
24/07/2024 |
12/08/2024
12:30 PM
|
Patuakhali |
| 3102 |
Dense Bituminous Surfacing-Wearing Course, Repair of potholes & Earthwork under Periodic Maintenance Programme (PMP-Roads) from Ch. 63 + 290 Km (jaliaghata) to 67 + 890 (kalmegha) km. of Rajapur- Kathalia-Amua-Bamna- Patharghata Road (Z-8708) under Barguna Road Division during the year 2023-2024.
02/e-GP/PMP-Roads/PRC/BARGURD/2023-2024
|
Mohammed Masud Karim (Superintending Engineer) |
24/07/2024 |
12/08/2024
12:15 PM
|
Patuakhali |
| 3103 |
Design, Supply, Erection, Testing & Commissioning of capacity
enhancement and Capacitor Bank installation with associated
switchgear in existing grid substation (Package-2, Lot-1)
27.21.0000.101.07.417.24.4059
|
Project Director, CEEGSTL Project |
30/07/2024 |
18/09/2024
11:00 AM
|
Dhaka |
| 3104 |
Design, Supply, Erection, Testing & Commissioning of capacity
enhancement and Capacitor Bank installation with associated
switchgear in existing grid substation (Package-2, Lot-2)
27.21.0000.101.07.417.24.4060
|
Project Director, CEEGSTL Project |
30/07/2024 |
18/09/2024
03:00 PM
|
Dhaka |
| 3105 |
Construction of 25.74m. (24.40m. x1) Long P.C. Girder Nabab Kachari Bridge over Baharampur Khal at 34th km. (Ch.33+288.05m.) of Lebukhali-Bauphal-Golachipa-Amragachia Road (Z-8806) under Patuakhali Road Division during the year 2023-2024.
08/e-GP/PMP-Bridge/PRC/PATRD/2023-2024
|
Mohammed Masud Karim (Superintending Engineer) |
24/07/2024 |
12/08/2024
12:00 PM
|
Patuakhali |
| 3106 |
Construction of 04 Nos. PC Girder/RCC Girder Bridge, 35 Nos. RCC Box Culvert and others ancillary work at Chaturi (Chowmohoni)-CUFL-Karnaphuli Dry Dock(Marine Academy)-Fakirnirhat National Highway(N-121)(Chainage: 00+000-15+000)with improvement of appropriate & standard width under Chattogram South Road Division during the year 2024-2025. (WP-01)
e-GP/OSTETM/CSRD/DEV-01/CUFL/2024-2025
|
Executive Engineer, Chattogram South Road Division |
29/07/2024 |
29/08/2024
11:00 AM
|
Chattogram |
| 3107 |
Construction of 3 Nos. DTW at Offsite Water Supply Facility, Rooppur Nuclear Power Plant, Ishwardi, Pabna (Package-3)
46.113.640.00.00.006.2024-25/EOWIFRNPP/03
|
Project Director, ‘Establishment of Offsite Water Intake Facility for Rooppur Nuclear Power Plant’ |
24/07/2024 |
19/08/2024
01:00 PM
|
Dhaka |
| 3108 |
Construction of 3 Nos. DTW at Offsite Water Supply Facility and Emergency Water Supply Site (2 nos at offiste and 1 no at emergency site), Rooppur Nuclear Power Plant, Ishwardi, Pabna (Package-4)
46.113.640.00.00.007.2024-25/EOWIFRNPP/04
|
Project Director, ‘Establishment of Offsite Water Intake Facility for Rooppur Nuclear Power Plant’ |
24/07/2024 |
19/08/2024
01:00 PM
|
Dhaka |
| 3109 |
Construction of 3 Nos. DTW at Offsite Water Supply Facility and Emergency Water Supply Site (2 nos at offiste and 1 no at emergency site), Rooppur Nuclear Power Plant, Ishwardi, Pabna (Package-4)
46.113.640.00.00.007.2024-25/EOWIFRNPP/04
|
Project Director, ‘Establishment of Offsite Water Intake Facility for Rooppur Nuclear Power Plant’ |
24/07/2024 |
19/08/2024
01:00 PM
|
Dhaka |
| 3110 |
Widening of Bazar Area, construction of drain, bus-bay and DBS Overlay at Ch: 276+030 km. to Ch: 276+130 km., Ch:296+610 km. to Ch: 297+060 km. (Padua Bazar) and Ch: 300+150 km. to Ch: 301+300 km (Lohagara-Amirabad) of Dhaka (Jatrabari)-Cumilla (Moinamati)-Chattogram-Cox'sbazar-Teknaf National Highway (N-1) under Chattogram South Road Division during the year 2024-2025.
e-GP/SE/CTG/PMP Road/CSRD/01/2024-2025
|
Superintending Engineer, RHD, Chattogram Road Circle, Chattogram. |
30/07/2024 |
29/08/2024
12:00 AM
|
Chattogram |