| 331 |
Widening of Road Embankment by Earth work, Widening (2x1.60m) of Existing Pavement, Road Surfacing by DBS (9.30m width), RCC Drain, Protective work, Sign-Signal, Km post, Road Marking work from Chainage 22+000 (Godown Ghat) to 28+350 (Mariamnagar) of Chattogram (Mohora)-Chandragona Regional Highway (R-163) under Chattogram Road Division during the year 2026-2027.
e-GP/PMP Road/03/EE/CRD/RHD/2026-2027 (ID-1320697)
|
Executive Engineer, RHD, Chattogram Road Division. |
20/08/2026 |
14/09/2026
12:00 PM
|
Chattogram |
| 332 |
Construction of Internal Road at Sylhet Mohila Polytechnic Institute, Dakshin Surma, Sylhet.
EED/Desk-5/912
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
10/06/2026 |
03/09/2026
12:00 PM
|
Sylhet |
| 333 |
Re-Construction of Boundary wall and fencing with sub-station-11 at East Residential Area.
18.13.0000.000.327.07.0006.25
|
Executive Engineer (Construction)/Chittagong Port Authority |
19/08/2026 |
10/09/2026
11:30 AM
|
Chattogram |
| 334 |
Re-Construction of Boundary wall and fencing with sub-station-10 at Road no. 07 in North Residential Area.
18.13.0000.000.327.07.0005.25
|
Executive Engineer (Construction)/Chittagong Port Authority |
19/08/2026 |
10/09/2026
03:00 PM
|
Chattogram |
| 335 |
Periodic Mantenence work by Aggregate Base Type I, DBS Base Course, DBS Wearing Course, RCC U-Drain, RCC Toe Wall With Slope Protection at Ch. 0+000 Km to Ch. 3+600 Km (Jogodishpur Muktijodda Chattor-to taliapara bazar), Ch. 4+000 Km to Ch. 20+000 Km (Taliapara bazar to Chanpur) and Construction of Rigid Pavement from Ch. 3+600 Km to Ch. 4+000 Km (taliapara bazar) of Jagodishpur-Chunarughat-Shsistaganj (N-204) Road under Road Division, Habiganj, during the year 2026-2027.
35.01.3600.429.07.249.25-1428
|
Habiganj Road Division |
18/08/2026 |
17/09/2026
01:00 PM
|
Habiganj |
| 336 |
Periodic Mantenence work by Aggregate Base Type I, DBS Base Course, DBS Wearing Course, RCC U-Drain at Ch. 20+000 Km to Ch. 25+160 Km (Chanpur Bazar to Chunarughat Bazar), Ch. 25+455 Km to Ch. 31+950 Km (Chunarughat Bazar to Durghapur Bazar), Ch. 32+135 Km to Ch. 34+000 Km (Durgha Pur Bazar to Shaistaganj) & Ch. 34+240 Km to Ch. 34+421 Km (Shaistaganj), and Construction of Rigid Pavement from Ch. 25+160 Km to 25+455 Km (Chunarughat bazar), Ch. 31+950 Km to Ch. 32+135 Km (Durgahpur bazar) Ch. 34+000 Km to Ch. 34+240 Km (Shaistaganj) of Jagodishpur-Chunarughat-Shsistaganj (N-204) Road under Road Division, Habiganj, during the year 2026-2027.
35.01.3600.429.07.249.25-1428
|
Habiganj Road Division |
18/08/2026 |
10/09/2026
01:00 PM
|
Habiganj |
| 337 |
Periodic Mantenence work by Providing DBS Base Course, DBS Wearing Course, RCC Palisiding, RCC U-Drain at Ch. 00+737 Km (Mirpur Bazar) to Ch. 12+000 Km (Muchai Bazer) & Construction of Rigid Pavement at Ch. 00+000 Km to Ch. 00+457 Km (Titarkona to Mirpur bazar), of Mirpur-Sreemongal-Moulvibazar-Sherpur Road (N-207) Road under Road Division, Habiganj, during the year 2026-2027.
35.01.3600.429.07.249.25-1428
|
Habiganj Road Division |
18/08/2026 |
10/09/2026
02:00 PM
|
Habiganj |
| 338 |
Finishing work of 2nd Floor of Chattogram Metropolitan Police Head Quarter Building (brickwork, plaster, paint, marble, granite, tiles, aluminium glass and Sanitary)
CTG-1/2025-26/CMP Tower/Finishing/2nd Floor
|
Executive Engineer,PWD Division-1,Rahamotganj,Chattogram |
19/08/2026 |
30/08/2026
12:00 PM
|
Chattogram |
| 339 |
Finishing work of 3rd Floor of Chattogram Metropolitan Police Head Quarter Building (brickwork, plaster, paint, marble, granite, tiles, aluminium glass and Sanitary)
CTG-1/2025-26/CMP Tower/Finishing/3rd Floor
|
Executive Engineer,PWD Division-1,Rahamotganj,Chattogram |
19/08/2026 |
30/08/2026
12:00 PM
|
Chattogram |
| 340 |
Replacement including installation of wiring, burned necessary circuit breaker, copper pipe, compressor oil, damaged/unserviceable spare parts, gas charge, magnetic contractor, compressor, servicing & repairing of split type AC in different rooms on 1st & 2nd floor in old & new building in 250 Bedded TB Hospital, Shyamoli, Dhaka.
EMWSHOP/2026-27/APP/NonRes/30-31-33
|
PWD EM Workshop Division,Sher -E-Bangla Nagar,Dhaka |
19/08/2026 |
31/08/2026
12:00 PM
|
Dhaka |