| 3341 |
Transport Service Provider (Freezer Van)
CMSD/SD-2307/NCT/2023-24/Proc.D-5/06
|
Central Medical Stores Depot(CMSD) |
15/11/2023 |
11/12/2023
11:00 AM
|
Dhaka |
| 3342 |
CONSTRUCTION OF 06-STORIED ADMINISTRATIVE BUILDING WITH 06-STORIED FOUNDATION INCLUDING SANITARY AND WATER SUPPLY WORKS ALONG WITH ELECTRIFICATION AND OTHER WORKS AT BAGERHAT POLYTECHNIC INSTITUTE, SADAR UPAZILA UNDER BAGERHAT DISTRICT.
37.07.0000.008.14.237.23.16 Dated: 31/10/2023
|
Office of the Executive Engineer, Education Engineering Department, Bagerhat. |
31/10/2023 |
14/12/2023
12:00 PM
|
Bagerhat |
| 3343 |
Construction of New Circuit House at Kushtia District(1st Revised)(Sub-Head: Fire Fighting
System (Hydrant System))
SE,jessore circle memo25.36./577
|
Kushtia Public Works Division |
26/10/2023 |
04/12/2023
12:30 PM
|
Kushtia |
| 3344 |
Construction of
1) 640m 4-Lane aesthetic Progressive Cantilever box girder bridge (Bridge-01)
2) 230m 4-Lane aesthetic Arch bridge (Bridge -02)
3) 3.40 (approx.) km 4-Lane Connecting Pavement road.
4) 4.29km River training work.
5) 3.365 km Slope Protection & others works.
46.02.0000.949.14.005.2022-198
|
Project Director |
15/11/2023 |
31/12/2023
03:00 PM
|
Dhaka |
| 3345 |
18.16.0000.373.02.196.23 COMC 005
|
BANGLADESH AGRICULTURE DEVELOPMENT CORPORATION (BADC) |
14/11/2023 |
19/11/2023
11:50 AM
|
Dhaka |
| 3346 |
Supply, installation, testing and commissioning of CCTV surveillance system for Vault Area at Bangladesh Bank, Motijheel Office,Chattogram Office, Barisal Office, Sylhet Office, Bogura Office, Rangpur Office, Khulna Office, Rajshahi Office and Sadarghat Office .
CSD-2(EEW):16/Vault/ CCTV/2023-164
|
Common Service Department-2, Bangladesh Bank, Head Office, Dhaka. |
13/11/2023 |
20/12/2023
02:00 PM
|
Dhaka |
| 3347 |
"01.Improvement of Betgari GC - Kachua GC Via Sairabarihat Road at Ch: 1500-11935m=10.44 Km under Gangachara Upazila, District: Rangpur (Road ID: 185272004) Cost of Salvage Materials: 31,89,282.00 Tk. & 02. Improvement of Betgari GC to Chandanerhat RHD Road at Ch:00-5462m=5.46 Km under Gangachara Upazila, District: Rangpur (Road ID:185272011) Cost of Salvage Materials:8,88,387.00 Tk, Total Cost of Salvage Materials:40,77,669.00Tk.
"
46.02.85000.000.07.108.23-3826(Tender No.15/2023-24)
|
Executive Engineer, LGED, Rangpur. |
13/11/2023 |
14/12/2023
01:00 PM
|
Rangpur |
| 3348 |
Procurement of Supply, Installation, Testing, Commissioning of 6.6 kV Switchgear Panel and other accessories, Restoration of 230 kV Substation, Generator- Transformer Protection Panel of Gas Turbine-1 of Shahjibazar 330 MW CCPP, BPDB, Hobiganj, Sylhet, Bangladesh on Turn-key basis.
27.11.0000.304.24.307.23
|
Director, Directorate of Purchase, BPDB, Dhaka |
14/11/2023 |
02/01/2024
11:00 AM
|
Dhaka |
| 3349 |
12.06.0000.241.40.198.23.2336
|
General Manager (Fertilizer Management). |
15/11/2023 |
21/11/2023
12:00 PM
|
Dhaka |
| 3350 |
12.06.0000.241.40.203.23.2320
|
General Manager (Fertilizer Management). |
14/11/2023 |
22/11/2023
12:00 PM
|
Dhaka |