| 41 |
18.16.0000.373.01.060(15).25-26/Comc: 04062026
|
Bangladesh Petroleum Corporation (BPC) |
10/06/2026 |
28/06/2026
12:00 PM
|
Chattogram |
| 42 |
Repair and Renovation Works of Jashore Circuit House for the Arrival of VVIP.
SE Office Jashore, Memo No: 2086, Date: 09/06/2026
|
Jessore PWD Division, Jashore |
09/06/2026 |
17/06/2026
03:45 PM
|
Jashore |
| 43 |
Ancillary Electrical Repair Works at Jashore Circuit House on the Arrival of
VVIP.
SE Office Jashore, Memo No: 2087, Date: 09/06/2026
|
Jessore PWD Division, Jashore |
09/06/2026 |
17/06/2026
04:30 PM
|
Jashore |
| 44 |
Annual Operation and Maintenance Works of the Existing Lift at Jashore
Medical College Hospital Building.
SE Office Jashore, Memo No: 2085, Date: 09/06/2026
|
Jessore PWD Division, Jashore |
09/06/2026 |
17/06/2026
03:30 PM
|
Jashore |
| 45 |
01/Ex/NRD/2025-2026
|
Executive Engineer, RHD, Narayanganj Road Division, Narayanganj. |
|
18/06/2026
11:30 AM
|
Narayanganj |
| 46 |
Construction of RCC Drain Part-1: From Shibchar Thana Road to Bir Muktijoddha Jinnah Master House Via Hatir Bagan Field (Length = 200m) at Ward No-03, Part-2: From Lipi Akhtar House to Nasir Shikder House (Length=140m) at Ward No-03, Part-3: From Shibchar Sadar Road to Kazi Bari Existing Drain Via Dr. Salam House (L=193m) at Ward No-01, Part-4: Upozila Complex Old Office Building to Bill Padma River Via Shibchar BRDP Office (L=200m) at Ward No-04, Under Shibchar Pourashava, Madaripur. (Total Length = 733.00m)
46.02.0000.676.14.04.24-599
|
Shibchar Pourashava, Madaripur. |
10/05/2026 |
30/06/2026
12:30 PM
|
Madaripur |
| 47 |
18.16.0000.373.03.196.25-26 COMC-002
|
BANGLADESH CHEMICAL INDUSTRIES CORPORATION (BCIC) |
07/06/2026 |
14/06/2026
11:15 AM
|
Dhaka |
| 48 |
Appointment of Pre-Shipment Inspection (PSI) Agent.
26.05.0000.016.17.156.26.2082
|
Additional Director (Commercial) |
03/06/2026 |
20/07/2026
11:30 AM
|
Dhaka |
| 49 |
Construction of Primary and Secondary Distribution Mains of Padma Transmission Network including all Material Supplies with O&M Support within Defect Notification Period at Dhaka South City Corporation area.
46.113.638.00.00.091.2026/EDWSRP/W-1/ICB-02.01/IT-01
|
Project Director, Expanded Dhaka Water Supply Resilience Project, Dhaka WASA. |
08/06/2026 |
27/07/2026
02:00 PM
|
Dhaka |
| 50 |
Construction of Primary and Secondary Distribution Mains of Padma Transmission Network including all Material Supplies with O&M Support within Defect Notification Period at Dhaka North City Corporation area.
46.113.638.00.00.093.2026/EDWSRP/W-2/ICB-02.02/IT-02
|
Project Director, Expanded Dhaka Water Supply Resilience Project, Dhaka WASA. |
08/06/2026 |
27/07/2026
02:00 PM
|
Dhaka |