| 4721 |
36.01.9135.549.55.001.23/127
|
Shahjalal Fertilizer Company Ltd. |
17/05/2023 |
20/06/2023
11:30 AM
|
Sylhet |
| 4722 |
Docking & Repairing works of CPA Pontoon Barge-27
18.13.0000.810.07.103.22
|
Chairman, Chattogram Port Authority represented by Deputy Chief Engineer (Marine). |
17/05/2023 |
15/06/2023
12:00 PM
|
Chattogram |
| 4723 |
A & B
DMP/DC (Transport)/PA/Tender/478
|
Transport Division, Dhaka Metropolitan Police, Dhaka. |
15/05/2023 |
07/06/2023
12:00 PM
|
Dhaka |
| 4724 |
Part-1: Construction Phase: Improvement of Sylhet-Tamabil Road to a 4-Lane Highway along with Slow Moving Vehicular Traffic Lanes (SMVT) on Both Sides from Sylhet to Khadim (Ch. Km. 228+300 to Km. 238+100).
Part-2: Maintenance Phase: Performance Based Maintenance works on Upgraded 4-Lane Sylhet-Tamabil Highway along with Slow Moving Vehicular Traffic Lanes (SMVT) on Both Sides from Sylhet to Khadim (Ch. Km. 228+300 to Km. 238+100).
STRIP-03/WP-01/2022-2023
|
Project Director, Improvement of Sylhet-Tamabil Road to a 4-Lane Highway with separate SMVT Lane Project . |
18/05/2023 |
10/07/2023
01:00 PM
|
Dhaka |
| 4725 |
Part-1: Construction Phase: Improvement of Sylhet-Tamabil Road to a 4-Lane Highway along with Slow Moving Vehicular Traffic Lanes (SMVT) on Both Sides from Sylhet to Khadim (Ch. Km. 228+300 to Km. 238+100).
Part-2: Maintenance Phase: Performance Based Maintenance works on Upgraded 4-Lane Sylhet-Tamabil Highway along with Slow Moving Vehicular Traffic Lanes (SMVT) on Both Sides from Sylhet to Khadim (Ch. Km. 228+300 to Km. 238+100).
STRIP-03/WP-01/2022-2023.
|
Project Director, Improvement of Sylhet-Tamabil Road to a 4-Lane Highway with separate SMVT Lane Project |
18/05/2023 |
10/07/2023
01:00 PM
|
Dhaka |
| 4726 |
Horizontal Extension of 02 Class Room & Toilet Block & Vertical Extension (1st Floor) on the Entire Ground Floor of Academic Building including Sanitary Water Supply & Internal Electrification Works at Saildah Bakpur Karamotia Fazil (Degree) Madrasha, Chitalmari, Bagerhat. (Fy-2021-22)
EED/Desk-1/2118 Dated: 16.04.2023
|
Office of the Executive Engineer, Education Engineering Department, Bagerhat. |
16/04/2023 |
01/06/2023
05:00 PM
|
Bagerhat |
| 4727 |
Horizontal Extension of 02 Class Room & Toilet Block & Vertical Extension (1st Floor) on the Entire Ground Floor of Academic Building including Sanitary Water Supply & Internal Electrification Works at Kafurpura Dakhil Madrasha, Sadar, Bagerhat. (Fy-2021-22)
EED/Desk-1/2118 Dated: 16.04.2023
|
Office of the Executive Engineer, Education Engineering Department, Bagerhat. |
16/04/2023 |
01/06/2023
12:00 PM
|
Bagerhat |
| 4728 |
Complete repair work
Memo No-44.01.0000.043.30-2022/DMP//Offtce/995
|
Police Commissioner, Dhaka Metropolitan Police, Dhaka |
11/05/2023 |
30/05/2023
12:00 PM
|
Dhaka |
| 4729 |
DMPs Cantonment Police Station
Memo No-44.01.0000.043.28-2022/Staff/992
|
Police Commissioner, Dhaka Metropolitan Police, Dhaka |
11/05/2023 |
30/05/2023
12:00 PM
|
Dhaka |
| 4730 |
work
Memo No-44.01.0000.043.30-2022/DMP//Offtcers Quarter/1003
|
Police Commissioner, Dhaka Metropolitan Police, Dhaka |
14/05/2023 |
06/06/2023
12:00 PM
|
Dhaka |