| 5611 |
Construction of Sewage Treatment Plant (STP) Shed, Drain and Sanitary Sewer Line at BPATC, Savar, Dhaka under the Project of "Enhancement of Training Capacity of BPATC, Savar, Dhaka".
T-16/1488 /2021-22
|
Savar Public Works Division |
23/06/2022 |
26/07/2022
12:00 PM
|
Dhaka |
| 5612 |
36.01.9135.549.55.001.22/252
|
Shahjalal Fertilizer Company Ltd. |
23/06/2022 |
26/07/2022
11:30 AM
|
Sylhet |
| 5613 |
Vertical extension of Meteorological Research Centre (SMRC) Building (Sub-Head: Supply, Installation, Testing & Commissioning of 500 KVA Sub-Station with LT/HT switch gear, 300 KVA canopied diesel generator set in/c. LT cable, Air conditioning system; Earthing & Lightning arrester system in/c surge protection device for building & tower, Dehumidifier, Water Heater & Electrical maintenance equipment & Fire Extinguisher; on Grid Solar System, PA & Conference system; IP based CCTV System for building & Complex, Telephone, PABX & Intercom System, Computer Networking System; Centrifugal pump motor set in/c. cable control etc. and Security light and Sign Board, 2 nos 100 Kg 6 stop passenger lift.
pwemw/SMRC
|
PWD EM Workshop Division |
23/06/2022 |
24/07/2022
12:00 PM
|
Dhaka |
| 5614 |
Construction of
1) 640m 4-Lane aesthetic Progressive Cantilever box girder bridge (Bridge-01)
2) 230m 4-Lane aesthetic Arch bridge (Bridge -02)
3) 3.40 (approx.) km 4-Lane Connecting Pavement road.
4) 4.29km River training work.
5) 3.365 km Slope Protection & others works.
46.02.0000.949.14.005.2022-665
|
Project Director |
20/06/2022 |
28/07/2022
03:00 PM
|
Dhaka |
| 5615 |
Construction of RCC Pavement on Existing Bituminous Carpeting Work at Bangladesh Bank Staff Quarter, Faridabad, Dhaka.
CSD-2(CEW): 02/07/10/2022- 28
|
Director (Engineering-Civil), Common Services Department-2, 6th floor of 30-storied Building, Bangladesh Bank, Head Office, Dhaka. |
08/05/2022 |
29/06/2022
02:30 PM
|
Dhaka |
| 5616 |
Construction of Range office with Earth work, boundary wall, approach road, small culvert etc at Debigonj, Panchagarh.
WD 23
|
Panchagarh PWD Division |
|
05/07/2022
12:00 PM
|
Panchagarh |
| 5617 |
Outsourcing System Manpower Supply
C S K/Section-3/2022/1868
|
Civil Surgeon Office, Khulna |
05/06/2022 |
05/07/2022
12:00 PM
|
Khulna |
| 5618 |
Construction of 1 x composite SMBK( 6 storey with 6 storied foundation) with office,JCO's Mess and store including ancillary works for 20 ECB at Chattaogram Cantt(3 rd Phase of 5 phases)
66 of 2021-2022/E-6 Dated 25 May 2022
|
Different B & R Works of Bangladesh Army for the finacial year 2021-2022 (As per Ser No 15) |
25/05/2022 |
28/06/2022
12:00 PM
|
Chattogram |
| 5619 |
Upgradation & Renovation of Narsingdi District Hospital from 100 to 250 Bed in Narsingdi District (Sub-Head: Air Cooler & Hepa filter Installation Works, Compound and Garden Light, Overhead Line, PABX System, CCTV, Sound System and Other Electro-Mechanical Works).
emdk9/202122/RevOP/Nrsdi/Hospital/HVACPABX
|
Executive Engineer (E/M), PWD E/M Division-9, Dhaka |
20/06/2022 |
03/07/2022
04:01 PM
|
Dhaka |
| 5620 |
Road and Storm Water Network for Mirsarai-2A EZ
03.07.0000.056.014.057.21-579
|
Project Director, Bangabandhu Sheikh Mujib Shilpa Nagar (BSMSN) Development Project |
20/06/2022 |
08/08/2022
02:00 PM
|
Dhaka |