| 6691 |
27.87.0000.516.07.001.19
|
DGM(ICT), Development, DPDC |
26/07/2020 |
23/08/2020
04:30 PM
|
Dhaka |
| 6692 |
Remodeling & Interior decoration works (Civil, Electrical & Aircooler) of Board Division, Chairman & MD's Secretariate, toilet block and ancilarry structure at 2nd floor (South side) of Sonali Bank Limited , Head Office, Motijheel, Dhaka.
EED/ED/SBL/HO/ 2ND FLOOR SOUTH/80
|
Sonali Bank Limited, Establishment & Engineering Division, Head Office, Dhaka. |
28/07/2020 |
24/08/2020
03:00 PM
|
Dhaka |
| 6693 |
Supply of Outsourcing Manpower (Guard Commander, Security Guard & Patrolman) From Service Provider at Different Offices, Residential Area, Installations, Gas and Condensate Pipelines of GTCL (Sylhet, Moulvibazar, Habiganj & Brahmanbaria
28.14.0000.130.01.001.20
|
Gas Transmission Company Limited. |
05/07/2020 |
12/08/2020
12:00 PM
|
Dhaka |
| 6694 |
Construction of 06 (Six) Storied Dormitory Building for Rajshahi office at Shah Mokhdum Residential Area, Rajshahi.
05/02/01-38/2020
|
Common Services Department-2, Bangladesh Bank, Head office, Dhaka |
09/07/2020 |
17/08/2020
02:30 PM
|
Dhaka |
| 6695 |
Street lighting by Renewable Energy in BSMSN
03.07.0000.007.14.223.2020-2616
|
Project Director, Bangladesh Economic Zones Development Project (Phase- 1) |
30/07/2020 |
07/09/2020
02:00 PM
|
Dhaka |
| 6696 |
Outsourcing metood manpower service
CSSJ/outsourcing/2020/1399
|
Civil Surgeon, Sunamgonj |
28/07/2020 |
27/08/2020
12:00 PM
|
Sunamganj |
| 6697 |
Construction of 4-Storied Singair Thana Building with 6-storied foundation including civil sanitary & electrical works FY-2020-21
Office of the ACE memo no.53
|
Executive Engineer, PWD division, Manikganj. |
13/07/2020 |
01/09/2020
11:30 AM
|
Manikganj |
| 6698 |
Construction of 45.00m long RCC Girder Bridge at Bhurghata over Gangnai river under Shibganj Pourashava, District: Bogura.
46.02.0000.944.14.01.19/195
|
Mayor, Shibganj Pourashava |
22/07/2020 |
17/08/2020
01:00 PM
|
Bogura |
| 6699 |
Re-Construction, Curve Straightening, Construction of Rigid Pavement, DBS-Base & Wearing Course, Construction of Inspection Bungalow at Ch: 22+000m to 52+000m = 30000.00m of Betgram-Tala-Paikgacha-Koyra Road (Z-7604) under Road Division, Khulna during the year 2020-2021.
e-GP-03/Dev/ACE Khu/2020-21 (WP-02)
|
Additional Chief Engineer, RHD, Khulna Zone, Khulna. |
23/07/2020 |
24/08/2020
01:00 PM
|
Khulna |
| 6700 |
Construction of P.C Girder Bridge (1216.96m P.C Girder & 100m Steel Bridge), Construction of Road Embankment, Bridge Approach, Service Road, RCC Box Culvert (20.00m), Construction of RCC Saucer Drain, Toe-Wall, Concrete Slope Protection, Intersection (2 nos), Sign, Signal, KM Post, Road Marking etc. over Bhairab River at 1st Km of Digholia (Raligate)-Arua-Gazirhat-Terokhada Road (Z-7040) under Road Division, Khulna during the year 2020-2021.
e-GP/04/DEV/ACE Khu/2020-21 (WP-01)
|
Additional Chief Engineer, RHD, Khulna Zone, Khulna. |
26/07/2020 |
26/08/2020
01:00 PM
|
Khulna |