| 7531 |
Work for Earthwork on Road EmbankmentWidening and Strengthening of Existing Pavement with Hard Shoulder2 x 3.60m 3.70m Surfacing DBS 10.90m Construction of RCC Box Culvert 7 Nos 45.00m Construction of Saucer Drain CC Block with Geo-TextileConstruction of Toe-Wall Sign Signal Km. Post Road Marking Installation of Directional Sign at Ramu-Fatekharkul-Maricha N-109 & 113 National Highway under Coxs Bazar Road Division during the Financial year-2019-2020WP-01.
e-Gp-1./Coxrd/DEV/SEmemo-600dt-01/03/2020.(WP-01)
|
Pintu Chakma |
01/03/2020 |
13/04/2020
11:30 AM
|
Cox's Bazar |
| 7532 |
Work for Earthwork on Road Embankment Widening and Strengthening of Existing Pavement with Hard Shoulder 2 x 3.60m 3.70m Surfacing DBS 10.90m Construction of RCC Box Culvert 9 Nos 44.00m Construction of Saucer Drain CC Block with Geo-Textile Construction of Toe-Wall Sign Signal Km. Post Road Marking Installation of Directional Sign at Ramu-Fatekharkul-Maricha N-113 National Highway under Coxs Bazar Road Division during the Financial year-2019-2020 (WP-02)
e-Gp-02./Coxrd/DEV/SEmemo-610dt-02/03/2020(WP-02)
|
Pintu Chakma |
02/03/2020 |
13/04/2020
12:00 PM
|
Cox's Bazar |
| 7533 |
1) Improvement of Sonahata GC (Dhunot) - Tangramagur RHD via Amrul UP - Naimile (Shajahanpur Portion) at Ch. 00m to 8870m Under Shajahanpur Upazila District Bogura (Road ID: 110962006) (Total Cost of Salvage Materials Tk. 10,00,220.00). 2) Improvement of Horikhali GC - Hatsherpur GC Via Charpara Road at Ch: 00m to 10010m under Sonatola Upazila District Bogura (Road ID: 110952006) & 02. Improvement of Matidali NHW - Pirgacha GCM Road at Ch: 00m to 9200m Under Sadar Upazila District Bogura (Road ID: 110202001) (Total Cost of Salvage Materials Tk.1,02,25,432.00). 3) Improvement of Nasratpur -Murail-Raykali-Beragram (Tilokpur) at Ch.00m to 6610m under Adamdighi Upazila Road ID110062006 (Total Cost of Salvage Materials TK.1252707.00) District Bogura. 4) 01. Improvement of Dupchanchia - Namoja via Tindighi GC Road at Ch.00m to 11750m under kahaloo Upazila District Bogura Road ID 110542005 & 02. Improvement of Ranirhat - Durgapur Road at Ch.00m to 10675m under Kahaloo Upazila District Bogura Road ID 110542001 (Total Cost of Salvage Materials Tk. 7058431.00)
Memo No.: 46.02.1000.000.14.044.2020.1010
|
Kazi Saiful Kabir, Executive Engineer LGED, Nishindhra, Bogura. |
09/03/2020 |
13/04/2020
01:00 PM
|
Bogura |
| 7534 |
Improvement of Road from Memnagar RHD-Karpashdanga G.C via Buichitala Road at Ch. 263m-5000m, 12145m-16946m & 20732m-24300m. under Damurhuda Upazila District Chuadanga (Road ID: 218312006) (Total Cost of Salvage Materials Tk. 80,22,027.00)
Memo No: 46.02.0000.931.19.243.19-31
|
The PE is Local Government Engineering Department, represented by: Executive Engineer, District: Chuadanga |
09/01/2020 |
13/04/2020
03:30 PM
|
Chuadanga |
| 7535 |
Partial shifting of the constructed shed (80 feet × 42 feet) in the temporary Police Camp area in Purbachal.
Memo No-44.01.0000.043.145-2018/10906 & Memo No. 5-2003 (Development)-Part-58)/279
|
Police Commissioner, Dhaka Metropolitan Police, Dhaka |
10/03/2020 |
24/03/2020
12:00 PM
|
Dhaka |
| 7536 |
150 & 180-feet 3-Legged self-supporting tower.
44.01.0000.057.11.049.19
|
SP (Logistics), Police Telecom & Information Management |
10/03/2020 |
13/04/2020
12:30 PM
|
Dhaka |
| 7537 |
150-feet 3-Legged self-supporting tower.
44.01.0000.057.11.051.19
|
SP (Logistics), Police Telecom & Information Management |
10/03/2020 |
30/03/2020
12:45 PM
|
Dhaka |
| 7538 |
1. Improvement of Kashiabari GC- Kaligonj GC via Naoduli Bazar From Ch. 0+000-11+882 m under Atrai Upazila District: Naogaon. (Road ID:164032006)
(Total Cost of Salvage Materials: Tk. 17,69,183.00)
46.02.6400.07.000.002.19- 581
|
Executive Engineer |
05/03/2020 |
16/04/2020
04:00 PM
|
Naogaon |
| 7539 |
APP-R-MILPAA FARI-2019/20
Add. Chief Engineer, PWD Zone Khulna, memo no-18-139
|
Executive Engineer, PWD Division, Kushtia. |
02/02/2020 |
08/04/2020
17:00 PM
|
Kushtia |
| 7540 |
Procurement of Non-Consulting Services (Outsourcing Manpower).
1. 28.15.0000.109.23.001.20 (Group-A) 2. 28.15.0000.109.23.002.20 (Group-B) 3. 28.15.0000.109.23.003.20 (Group-C)
|
Karnaphuli Gas Distribution Company Limited |
09/03/2020 |
07/04/2020
12:00 PM
|
Chattogram |