Ministry/Division |
: |
Ministry of Road Transport and Bridges |
Agency |
: |
Dhaka Transport Co-ordination Authority (DTCA) |
Procuring Entity Name |
: |
Dhaka Transport Coordination Authority (DTCA) |
Procuring Entity Code |
: |
|
Procuring Entity District |
: |
Dhaka |
Expression of Interest for Selection of |
: |
Consulting Firm (National) (Lump-Sump) |
Title Of Service |
: |
The Feasibility Study on BRT Line 7 in Dhaka, Bangladesh |
EOI Ref. No. |
: |
35.02.0000.003.32.001.18-383 |
Date |
: |
10/12/2018 |
KEY INFORMATION
|
Procurement Sub-Method |
: |
Selection under a Fixed Budget(SFB) |
FUNDING INFORMATION
|
Budget and Source of Funds |
: |
Development Budget GOB |
Development Partners |
: |
|
PARTICULAR INFORMATION
|
Project/Programme Name |
: |
|
EOI Closing Date and Time |
: |
07/01/2019 05.00PM
|
Publication Date |
: |
19/12/2018
|
INFORMATION FOR APPLICANT
|
Brief Description of Assignment |
: |
The Consultant will perform a study for the Bus Rapid Transit (BRT) Line with the goals of improving accessibility while reducing negative environmental impacts, improving the general quality of the urban fabric and social conditions in the indented extension of Dhaka.
The consultant will collect and overview related Information (e.g. traffic and transport, socio-economic, geographic etc.) from existing sources and literature review. They willreview relevant Demand Forecasts, Models and other traffic analysis by previous study/ data.The consultant will conduct a Topographic Survey of the corridor along the proposed alignment for the line. Identify the suitable station location with feeder services.
The consultant will propose a preliminary Operation Plan for the BRT line, a Bus Fleet based on studies like ridership analysis, operation plan, economic viability etc. Identify Candidate Site Location and a Preliminary Plan of Depot/s.The consultant will propose an Alignment Plan which includes basic conceptual design components.
The consultant will carry out Financial and Economic Evaluation including analysis of Public Private Partnership (PPP) option among others. Carry out Traffic, Environmental and Social Impact Assessment (TIA, EIA and SIA). The consultant will identify the land required for the project and prepare a Land Acquisition Proposal Carryout Project Cost Estimation including Construction Cost, Land Acquisition Cost, Resettlement/Compensation Cost and other related costs.
Formulate Project Implementation Program and phases.Prepare a preliminary Development Project Proforma (DPP) for the project.The consultant will conduct workshops and arrange working group meetings as required.
Perform such other tasks as will be detailed in the Terms of Reference (TOR) to be supplied to successfully shortlisted candidates following ranking of submitted Expressions of Interest. |
Experience, Resources and Delivery Capacity Required |
: |
(i) Registration of the firm (s), (ii) Company profile: brochure including management, personnel, firm’s specialty, performance etc., (iii) Availability and Summary of qualification of key professionals, (iv) List of rendered services in last 5(five) years (v)Experience in similar tasks, (vi)Yearly turnover of the firm for last 5 (five) years and (vii) History of litigation in courts or any arbitration proceedings (if any). |
Other Details (if applicable) |
: |
the Eastern Fringe Area of Dhaka from Narayanganj to Kapasia, Bangladesh. The Government of Bangladesh (GoB) has decided to conduct a Feasibility study for the Bus Rapid Transit Line-7. In order to conduct the above mentioned work DTCA intends to appoint Consulting firm(s) for the required services.
The BRT Line-7 will be constructed with a view to realizing the future traffic demand in the Eastern Fringe Area of Dhaka. It will connect some important nodes and trade or production centers like Fatulla, Shiddhirganj, Rupganj etc., will go through or near areas for future residential development, and also will be at the vicinity of the water retention areas. According to RSTP (2016), the projected daily ridership in the year 2035, for the approximately 60 km long BRT line-7 will be 320,900 (Pax/day) while assuming the public transport share of total passengers will be 40% of the total. |
Association with foreign firms is |
: |
Encouraged |
Eoi Detail Information |
Ref No |
Phasing Of Services |
Location |
Start Date |
Completion Date |
1 |
Feasibility Study on BRT Line 7 in Dhaka, Bangladesh |
Eastern Fringe Area of Dhaka from Narayanganj to Kapasia, Bangladesh |
April, 2019 |
November, 2019 |
|
PROCURING ENTITY DETAILS
|
Name of Official Inviting EOI |
: |
Md. Anisur Rahman |
Designation of Official Inviting EOI |
: |
Project Director |
Address of Official Inviting EOI |
: |
Nagar Bhaban (Level-12), Fulbaria, Dhaka-1000. |
Contact details of Official Inviting EOI |
: |
Phone : 8802-9569262, Fax : , Email : |
The procuring entity reserves the right to accept or reject all tenders |