| Ministry/Division |
: |
Ministry of Post, Telecommunications & Information Technology |
| Agency |
: |
Bangladesh Hi-Tech Park Authority |
| Procuring Entity Name |
: |
Establishing 32 Sheikh Kamal IT Training & Incubation Center Project at Different Districts |
| Procuring Entity Code |
: |
|
| Procuring Entity District |
: |
Dhaka |
| Expression of Interest for Selection of |
: |
Consulting Firm (National) (Time-Based) |
| Title Of Service |
: |
Architectural and Engineering Consultancy Firms |
| EOI Ref. No. |
: |
56.02.0000.030.07.001.21-371 |
| Date |
: |
04/04/2021 |
KEY INFORMATION
|
| Procurement Sub-Method |
: |
Quality and Cost Based Selection(QCBS) |
FUNDING INFORMATION
|
| Budget and Source of Funds |
: |
Non_Development GOB |
| Development Partners |
: |
|
PARTICULAR INFORMATION
|
| Project/Programme Name |
: |
Feasibility Study for Establishing 32 Sheikh Kamal IT Training & Incubation Center Project at Different Districts |
| EOI Closing Date and Time |
: |
04/05/2021 03:00 PM
|
| Publication Date |
: |
05/04/2021
|
INFORMATION FOR APPLICANT
|
| Brief Description of Assignment |
: |
Feasibility Study for Establishing 32 Sheikh Kamal IT Training & Incubation Center Project at Different Districts at (1) Gazipur (66 acre) (2) Shariatpur (3) Munshiganj (4) Madaripur (5) Rajbari (6) Faridpur (7) Narsingdi (8) Chottogram (Chottogram University) (9) Brahmanbaria (10) Khagrachhari (11) Cox's Bazar (12) Rangamati (13) Lakshmipur (14) Rajshahi (15) Bogra (16) Naogaon (17) Chapainawabganj (18) Pabna (19) khulna (20) Jashore (21) Bagherhat (22) Satkhira (23) Jhenaidah (24) Chuadanga (25) Maulvibazar (26) Mymensingh (27) Jamalpur (28) Barguna (29) Jhalokati (30) Pirojpur (31) Lalmonirhat & (32) Kurigram which includes but not limited to –
1. Digital Survey and Sub-soil Investigation;
2. Conducting the full scale Feasibility Studies for Establishing 32 Sheikh Kamal IT Training & Incubation Center Project at Different Districts to address the issues of technical, social, environmental and financial, economical involvements (NPV, IRR, BCR) including recommendations so as to ascertain the suitability of establishing 32 Sheikh Kamal IT Training & Incubation Center at each of the sites;
3. Submit the Feasibility Study Reports complete in all respect with detailed analyses, insertion of supporting documents like Digital Survey maps/sketches, drawings etc. and ancillary reports etc. along with all documents as per direction of the Project/Programme Authority;
4. Submission of all relevant documents Hardcopy and Softcopy including maps, drawings, designs in adequate numbers of copies as per requirement of Project/Programme;
5. Preparing the visionary master plan showing the Site lay-out with present and future infrastructure requirements, Landscaping and 3D Perspectives to include all features like boundary wall & gate, existing lakes, RCC Culverts, etc. and proposed Administrative Building, Internal Roads, Walkways, Water Supply & Sanitation system, Drainage and Water Management system of whole Park, Utilities Services like Fiber Optic backed Telecom system, Electricity & Gas connectivity, Green Building concept of using Solar Energy, Security with CCTV, Fire Fighting system, digital survey of whole park, Integrated Master plan of whole Sheikh Kamal IT Training & Incubation Center for drainage system, sewerage system, gas line, water line etc. |
| Experience, Resources and Delivery Capacity Required |
: |
The EOI must contain information demonstrating that they are qualified to perform the services delineated the criteria of evaluation of the EOI shall include:
a) Eligibility- i) The Firm should have minimum 7 (seven) years general experience in the field of architectural and engineering consultancy.
ii) The Firm should have specific experience in the relevant Master Plan Preparation/Feasibility Study consultancy services of Township mega Project/Hi-Tech Park/Software Technology Park.
iii) The firms may form Joint Venture in the case of Joint Venture all firms/entities shall be Jointly and Severally liable for the entire consultant’s obligation under the contract. The total number of firm’s limited to accordance with Public Procurement Rules-2008.
b) Management Competence – information such as the company age, legal status like - company registration certificate, trade license, VAT registration certificate and up to date Income Tax clearance certificate, last 03 (three) years audit report (only summary part) reputation, organizational structure, financial and managerial capability of the firm or the consortium shall be assessed to judge their competence;
c) Technical Competence – the EOI should summarize the diversified experiences of the firm (or combined experiences of the consortium) supported by project sheets which should be annexed to the EOI.
d) HR Competence – the EOI should demonstrate the availability of pool of qualified and experienced engineers with the firm or the consortium. |
| Other Details (if applicable) |
: |
Interested firms shall submit EOI maximum 300 page (both side printed, one set with original sign and seal) to the Project/Programme Director of Hi-Tech Park Authority within the given time frame. The EOI’s will be evaluated according to the provisions of the public Procurement Rules-2008 Guidelines.
N.B. Details men-month will be given during RFP.
|
| Association with foreign firms is |
: |
Not Encouraged |
| Eoi Detail Information |
| Ref No |
Phasing Of Services |
Location |
Start Date |
Completion Date |
| - |
Not Phased |
32 District |
June 2021 |
January 2022 |
|
PROCURING ENTITY DETAILS
|
| Name of Official Inviting EOI |
: |
Zohra Begum |
| Designation of Official Inviting EOI |
: |
Project/Programme Director |
| Address of Official Inviting EOI |
: |
ICT Tower, Plot E-14/X, Agargaon, Shere-e-Bangla Nagar, Dhaka |
| Contact details of Official Inviting EOI |
: |
Phone : 88-02-55006975 , Fax : , Email : |
| The procuring entity reserves the right to accept or reject all tenders |