4001 |
Carrying out of the Hydrological and Morphological Study, Techno-economic feasibility and Environmental Impact Assessment(EIA) & Detail Engineering Design (Including Sub-soil Investigation, Topographical Survey, Preparation of Land Acquisition & Resettlement Plan for Approach/Access Road if required, Preparation of Structural Design, Cost Estimate, BOQ with bar bending schedule, Technical Specification, Tender Document etc with top supervision.) for 2 Bridges.
46.02.0000.7102.11.001.2018.485
|
The Project Director, Development of Important Rural Infrastructure Project(Phase-II) |
30/05/2018 |
04/07/2018
2:00 PM
|
Dhaka |
4002 |
Consultancy services /Technical Assistance for Public Investment Facility for Infrastructure Constraints (PIFIC) (Market Prioritization, Engineering Design and Supervision of Cluster Infrastructure)
26.00.0000.010.11.027.18/50
|
Project Director (Additional Secretary) Export Competitiveness for Jobs Project SEL Rose N Dale Building (6th Floor) 116, Kazi Nazrul Islam Avenue, Dhaka-1000. |
30/05/2018 |
20/06/2018
5.00 pm
|
Dhaka |
4003 |
Support Services
46.02.0000.001.99.18.01.05
|
Southern Country Iron Bridge Reconstruction & Rehabilitation Project, LGED (Level-5),62, West Agargaon, Sher-e-Bangla Nagar,Dhaka-1207 |
29/05/2018 |
26/06/2018
1:00 PM
|
Dhaka |
4004 |
Feasibility Study for Construction of Circular Rail Line around Dhaka City
54.01.2600.011.14.001.18-13
|
Project Director, “Feasibility Study for Construction of Circular Rail Line around Dhaka City” Project |
27/05/2018 |
25/06/2018
12:30 PM
|
Dhaka |
4005 |
Financial Sector Support Project
BB-S21
|
Bangladesh Bank |
27/05/2018 |
21/06/2018
05:00 PM
|
Dhaka |
4006 |
Training Management Consultant/Specialist
DSHE/ICTP-II-52/2018/SD1/325
|
Project Director |
27/05/2018 |
08/06/2018
2:00 pm
|
Dhaka |
4007 |
Individual Consultants (National) under Different Position for Improvement of Ponds, Canals Across the Country Project (IPCP).
1. Engineering Survey Specialist. 2. Digital Survey Expert
46.02.0000.891.11.004.18.354
|
Md. Mizanur Rahman |
24/05/2018 |
21/06/2018
2.00 PM
|
Dhaka |
4008 |
A) Feasibility Study for construction of railway line from (a) Chapainawabganj to sonamasjid, (b) Panchagarh to Banglabandha, (c) Domar to votemari via Jaldhaka as per TOR and
(B) Feasibility study, detailed design and preparation of bid documents for construction of new railway bridge on Tista river beside the existing railway bridge as per TOR.
54.01.8100.155.05.042.15
|
Chief Engineer (West) & Project Director, Bangladesh Railway, Rajshahi |
23/05/2018 |
08/07/2018
12:30
|
Rajshahi |
4009 |
Developing Management Plan for the improvement of AQM & Sustainable Environment Management
Paribesh/CASE/Developing Management Plan/DoE-S29/270/2018/ 375
|
Project Director, Clean Air and Sustainable Environment (CASE) Project - DoE Component |
23/05/2018 |
31/05/2018
3.00 pm
|
Dhaka |
4010 |
Consulting Services for Developing (a) Certified Reference Material (CRM) system as per relevant ISO standards (b) Proficiency Testing/ Inter Laboratory Comparison (PT/ILC) providing system as per relevant ISO standards (c) DRiCM Act, related policies, administrative guideline/ regulation , necessary agreements relating to Chemical Metrology Institute (Draft) (d) Quality Manual according to ISO/IEC Standards (e) Human Resources in the field of Chemical Metrology (f) Publicity/ Awareness building and Related activities for Designated Reference Institute for Chemical Measurements DRiCM, BCSIR.
2605.5013.05.004.2018
|
Augmentation of Chemical Metrology Infrastructure |
22/05/2018 |
04/06/2018
03.00 PM
|
Dhaka |