4171 |
Consultency Service
27.12.3224.523.200.61.18.147
|
General Manager, Gaibandha Palli Bidyut Samity. |
16/01/2018 |
30/01/2018
12:00 AM
|
Gaibandha |
4172 |
REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR APPOINTMENT OF INTERNATIONAL CONSULTANT FOR IMPLEMENTATION OF INDEPENDENT SYSTEM OPERATOR (ISO)
27.71.0000.00406.050.17-1288
|
Director General, Power Cell, Ministry of Power, Energy and Mineral Resources |
16/01/2018 |
22/01/2018
05:00 PM
|
Dhaka |
4173 |
Support to Capacity Building of Bangladesh Economic Zones Authority
03.761.026.01.02.004.2014(Part-1) -3304
|
Project Director (Joint Secretary) |
15/01/2018 |
24/01/2018
|
Dhaka |
4174 |
Sales and marketing of the services of Bangabandhu Satellite-1 of the regoional, national and international market
BCSCL/MD/Marketing/2017-143
|
Managing Director (Additional Secretary) |
15/01/2018 |
14/02/2018
|
Dhaka |
4175 |
"Feasibility studies of 5 (Five) Newly proposed Hi-Tech Park at Madaripur (Shibchar), Manikgonj, Jaipurhat, Chandpur (Matlab) and Sirajgonj which includes but not limited to –
1. Digital Survey and Sub-soil Investigation;
2. Conducting the full scale feasibility studies of establishing proposed Hi-Tech Park at Madaripur (Shibchar), Manikgonj, Jaipurhat, Chandpur (Matlab) and Sirajgonj to address the issues of technical, social, environmental and financial, economical involvements (NPV, IRR, BCR) including recommendations so as to ascertain the suitability of establishing Hi-Tech Parks at each of the sites;
3. Submit the Feasibility Study Reports complete in all respect with detailed analyses, insertion of supporting documents like Digital Survey maps/sketches, drawings etc. and ancillary reports etc. along with all documents as per direction of the BHTPA.
4. Submission of all relevant documents Hardcopy and Softcopy including maps, drawings, designs in adequate numbers of copies as per direction of the Engineer-in-Charge.
5. Preparing the visionary Master plan showing the Site lay out with present and future infrastructure requirement, Landscaping and 3D Perspectives to include all features like boundary walls, existing lakes, RCC Culverts, etc. and proposed Administrative Building, Internal Roads, Walkways, Water Supply & Sanitation system, Drainage and Water Management system of whole Park , Utilities Services like Fiber Optic backed Telecom system, Electricity & Gas connectivity, Green Building concept of using Solar Energy, Security with CCTV, Fire Fighting system, digital survey of whole park, Integrated Master plan of whole parks for drainage system, sewerage system, gas line, water line etc."
56.02.0000.007.011.85.17-47
|
Bangladesh Hi-Tech Park Authority |
15/01/2018 |
05/02/2018
03:00 PM
|
Dhaka |
4176 |
Feasibility studies of 5 (Five) Newly proposed Hi-Tech Park areas at different places.
56.02.0000.007.011.85.17- 47
|
Bangladesh Hi-Tech Park Authority |
11/01/2018 |
05/02/2018
15.00 local time
|
Dhaka |
4177 |
Senior Financial Management Specialist
SD-13/397
|
Modern Food Storage Facilities Project |
10/01/2018 |
18/01/2018
2:00 PM
|
Dhaka |
4178 |
National Agricultural Technology Program Phase II (NATP-2)
NATP-2/PIU-BARC-20/2016/1761
|
Project Implementation Unit (PIU), NATP-2, Bangladesh Agricultural Research Council |
09/01/2018 |
14/01/2018
|
Dhaka |
4179 |
National Agricultural Technology Program Phase II (NATP-2)
NATP-2/PIU-BARC-20/2016/1761
|
Project Implementation Unit(PIU), NATP-2, Bangladesh Agricultural Research Council |
08/01/2018 |
14/01/2018
|
Dhaka |
4180 |
Consulting firm.
25.41.0000. 021.0104.17
|
Khulna Development Authority |
04/01/2018 |
28/01/2018
05:00 PM
|
Khulna |