261 |
(Part-1) Estimate for Laying of 1-500 mm dia uPVC Main Line From Zero Point Header Tank To Bhut puker Pond (A4-B4-C4-D4-E4-F4 Ch.0+000km to 1+290km, Length= 1290m) With Ancillary Works Inculding MS Casting Pipe For Road Crossing (Part-2) Estimate for Laying of 1-250mm dia uPVC Branch Line from Asroful Land to Boro Maidia Land (B4-C41, Ch-0+000km to 0+500km, Length=500m), From Gate Valve to Beel Boroell (A3- B31-C31, Ch. 0+000km To 0+700km Length= 700m) And From Bairagi Dagapara To Dagapara Land (F-G, Ch. 0+00km To 0+500km, Length=500m) (Total Length=1700m With Ancillary Works of Kalitala-Khashmahal CAD Sub-Project (SP. No-44121) Under Sadar Upazila, Dist: Chapai Nawabganj
APP ID : 205161
|
Executive Engineer, LGED, Chapainawabganj |
30/04/2025 |
02/06/2025
11:00 AM
|
Chapai Nawabganj |
262 |
Improvement of Mastan Bazar-Adina College via Khonda RNGPS Monakosha UP Road from Ch.00-2650.00m & Construction of 04 Nos U-Drain Size 0.625m X0.600m at Ch.1100m, 1380m, 1465m,& 1945m On Same road.[Road ID:170885120] [Salvage Cost-23,38,540.00] under Shibganj Upazila, District: Chapainawabganj.
APP ID : 211409
|
Executive Engineer, LGED, Chapainawabganj |
28/04/2025 |
17/06/2025
11:00 AM
|
Chapai Nawabganj |
263 |
a)Improvement of Shahapara Bazar - Shahapara Bottola Bazar mour via Chillahipara Monakasha UP road at Ch.00-3042.00m b)Construction of 05Nos U-Drain Size 0.625m X0.600m at Ch.1296m, 1440m, 1995m,2436m &2541m On Same road c) Construction of 01Nos Box Culvert Size 3.00mX3.00m at Ch.2652 On Same road. [Road ID:170885390] [ Salvage:80,04,925.00]
APP ID-211409
|
Executive Engineer, LGED, Chapainawabganj |
28/04/2025 |
17/06/2025
11:00 AM
|
Chapai Nawabganj |
264 |
Ancilary Repairing & Maintenance works of North Side Boundary Wal at the
Residence of Learned Senior District and Sessions Judge,Jashore.
PWD/JSR/24-25/RAPP R-36/Memo-1410
|
Executive Engineer, Jashore PWD Division, Jashore |
|
04/06/2025
05:30 PM
|
Jashore |
265 |
Electrical Repair works at the residence of Superintending Engineer , Jashore
PWD Circle ,Jashore.
PWD/JSR/24-25/RAPP EM-R-18/SE-1660
|
Executive Engineer, Jashore PWD Division, Jashore |
|
04/06/2025
12:00 PM
|
Jashore |
266 |
Ancilary repair & maintenance work with repair works of Shed & Guard Room
at the residence of Executive Engineer , Jashore PWD Division ,Jashore
PWD/JSR/24-25/RAPP-R21
|
Executive Engineer, Jashore PWD Division, Jashore |
|
04/06/2025
12:00 PM
|
Jashore |
267 |
Providing Bituminous Seal Coat on Roads within Jetty-1 area.
18.13.0000.326.07.007.24
|
Executive Engineer_Jetty |
20/05/2025 |
16/06/2025
11:00 AM
|
Chattogram |
268 |
Ancillary electrical works including replacement of damaged/unserviceable HT switchgear, burned LT service cable, damaged/unserviceable spare parts replacement, repairing & servicing of existing 02Nos 1250KVA electric substation in National Museum of Science and Technology (NMST) Complex Building at Agargaon, Dhaka.
pwemw/ownfund/2024-25/NMST/312448
|
PWD EM Workshop Division |
20/05/2025 |
02/06/2025
12:00 PM
|
Dhaka |
269 |
Outsourcing of Manpower for Urban Water Supply and Sanitation in 23 Pourashavas Project (GOB-IDB).
46.03.2600.000.07.001.18-8821
|
Executive Engineer, Survey Investigation and Research Division, DPHE, Kakrail, Dhaka. |
12/05/2025 |
16/06/2025
12:00 PM
|
Dhaka |
270 |
W/DGM-ICT-D/24-25/004
|
DGM (ICT), Development |
16/05/2025 |
19/06/2025
03:45 PM
|
Dhaka |